Maintenance is a program to keep all the parts of the machine in perfect condition with minimum wear and tear.
Preventive Maintenance in Blow Room; It means to attend and check the machines regularly and systematically and defects are discovered and remedied before they cause a need for, major repair and before the wear & tear of the machine starts affecting the quality and production, | Parts to be inspected | Rating & Action taken Remarks Repaired/replaced | | Check the condition of:
|
| 1 | spikes on lattice &lattice tension | If the part is defective, write "poor & needs Correction" in the rate & Remark column. | 2 | Striking edge of all the beaters | | 3 | Feed roller weighting & its setting with beater. | The parts that are replaced or repaired will be entered by maintenance incharge. | 4 | Position of damper & air current in the cage. | | 5 | Sharpness of blade/spike/pins of beater. | Importance of maintenance in Blow Room. | 6 | Stripping rail setting in beater. | | 7 | Function of P.E. cell swing door & other feed control mechanisms. | If a serious breakdown occur in Blow | 8 | Condition of pedal feed control mechanisms. | |
9 | Calender Roller bearing & its weighting. | Room, a high proportion | | | of a Mills production will | 10 | Racks condition & Effectiveness | be stopped causing the | | of brake. | subsequent process to be | 11 | Timing and synchronisation of | short of material. | | auto doffing mechanism. | This can be avoided to | 12 | Lap length measuring motion. | some extent by a thorough | 13 | Lap hardening Mechanism. | inspection and systematic | 14 | Lubrication system | Programme of maintenance. | 15 | Al1 bearings-condition. | which can also helps to | 16 | Belt, gear, chain, Robe & | reduce the 1ap | | all driving connection. | irregularities and improve | 17 | Motor & its pulley condition. | the cleaning efficiency. | 18 | Roller vibration/ Eccentricity | | 19 | Speed & settings. | | 20 | Pan whether chocked with dust, | | | or not. | | 21 | R.H.% & Temp condition. | | 22 | Ratio of fan to beater speed & | | | Air current. | | 23 | Robe & Bls tension. | | 24 | All nuts, Bolts, screws-tightening | | 25 | Check for any rough places on | | | various rollers or calenders Routine Maintenance in Blow Room: It means to attend the machine and maintenance work is carried out as per the maintenance schedule so as to maintain the Machine in perfect condition with minimum wear & tear.
Nature of operation Frequency 1. Dismantling -Checking- thorough cleaning & resetting of i) Cage Unit, ii) Lap doffing unit Every month
iii) Lap measuring Motion | | | iv) Lap hardening Mechanism. | | | v) Piano feed regulating Motion | | | | | 2. | Cleaning of grid bar | Every shift | | | | 3. | Removal of droppings from beneath | | | the grid bar. | Twice per Shift | | | | 4. | Straightening of bent pins of | Whenever needs | | kirschner beater and sharpening the | | | beater blade. | | | | | 5. | Polishing of grid bar. | 6 months | | | | 6. | reversal of beater blade. | 1 year | | | | 7. | Re dressing of beater blade | 2 year | | | | 8. | Clean inside the cage | each shift. | | | | 9. | Applying Black-lead powder inside the | | | cage | periodically | | | | 10 | . General cleaning | .15 days | | | | 11 | . Lubrication of all the gear wheel | Daily & greasing at | | &. bearing. | the time of frame cleaning. | | | | 12 | correct the leakage places in the | | | entire pneumatic duct line. | Every week. |
|
|
|
|